Lead, Research & Development Engineer
Proteor acquired Filament Innovations in January 2025. The CTO role expanded under the Lead, Research and Development Engineer role.
- Led the design and development of ICARUS-Lite, a compact industrial machine for prosthetic and orthotic production, owning its mechanical, electrical, and software design, including custom AC heaters and a 120/240 VAC electrical system drawn to IEEE schematic conventions; cut assembly time by 80% compared to the previous design.
- Completed the design changes supporting conformity with the 2006/42/EC Machinery Directive; ICARUS-Lite and ICARUS-Pro are now in CE testing.
- Owned ICARUS-Lite through commercialization against unit goals of 60 in 2025 and 100 in 2026, contributing to increased revenue.
- Standardized POSEIDON and ICARUS on one linear-motor architecture with swappable mounts, replacing servo-driven ballscrews to cut product-to-product architectural complexity and simplify service; validated 4-micron precision at 4 m/s with a 30 kg moving mass.
- Built ExtrusionStudio, the plant's measurement and labeling system for its extrusion lines (see page 3).
- Provide cross-functional technical support for the product line, from troubleshooting to after-sales service, including the escalations customer support cannot resolve.
- Performed risk analysis and mitigations to EU and U.S. standards across ProteorPrint hardware and cloud products.
- Contributed the machine requirements and integration for ProteorPrint OS with an external software partner (SimplyPrint), giving users remote operation, live video monitoring, machine-vision failure detection with AI-assisted alerts, and material, waste, and outcome metrics for analytics-driven operational decisions.
- Estimate and track the budget of every engineering project, build its BOMs, and maintain each product's unit cost; present project status, constraints, and budgets at Proteor's monthly USA review with leadership from its global locations.
- Managed the Coplay location's Business Central ERP implementation in five weeks: two weeks evaluating the software, then three migrating more than 2,000 items and 150+ products into the live system, reconciling inventory counts on the floor, and syncing SKUs with Proteor's global locations.
- Act as Hiring Manager for engineering roles, conducting technical interviews and owning final hiring decisions.